D10 Business In A BoxD10 Business In A Box
  • Home
  • About
  • F.A.Q.
  • Service Disabled Veterans
  • What exactly is Division 10?
  • A Day In the Life of a D10 Estimator
  • Call to Action
  • What's Inside the D10 Box?
  • D10 Business In A Box PODCAST
  • SOP's
  • Schedule Online Meeting
  • Signage D10 Subcontractor (Case Studies)
  • Testimonials
  • The D10 Husband & Wife Team
  • Call To Adventure!
  • SOP Video
     
    D10 Business In A BoxD10 Business In A Box
      • Home
      • About
      • F.A.Q.
      • Service Disabled Veterans
      • What exactly is Division 10?
      • A Day In the Life of a D10 Estimator
      • Call to Action
      • What's Inside the D10 Box?
      • D10 Business In A Box PODCAST
      • SOP's
      • Schedule Online Meeting
      • Signage D10 Subcontractor (Case Studies)
      • Testimonials
      • The D10 Husband & Wife Team
      • Call To Adventure!
      • SOP Video

      Signage D10 Subcontractor (Case Studies)


      • Album
      Case Study #1 - Chicago, Illinois - Contract: $24,200 (Materials/Installation)
Scope of Work: Exterior illuminated letters, Exterior custom metal graphic element, Interior ADA signs.
      Case Study #1 - Architectural Drawings - You will need to do a "Takeoff" or in other words, find your signage in the construction drawings.  Here is example we found, an exterior building signage - graphic element (Flat Cut Aluminum) that will need to be priced and be included in your base bid to the General Contractor.
      Case Study #1 - Production Drawings - Once you have a contract to produce the signage, you will need to start on "Submittals" and submit to your General Contractor who will forward to the (AOR) Architect of Record for review/comments.  (These drawings will eventually be approved and sent into scheduled production with your wholesale manufacture of choice)
      Case Study #2 Kay County, Oklahoma - Contract: $9,400 - (Materials/Installation) BEFORE and After picture. Scope of Work: Exterior Flat Cut Aluminum letters, Interior ADA signs.
      Case Study #2 - AFTER picture of the Kay County Oklahoma Department of Transportation.
      Case Study #2 - This is the architectural drawing we used to bid the materials and was used as a reference when supplying the drawings submittal to the architect.
      Case Study #2 - Once you have a contract to produce the signage, you will need to start on "Submittals" and submit to your General Contractor who will forward to the (AOR) Architect of Record for review/comments.  (These drawings will eventually be approved and sent into scheduled production with your wholesale manufacture of choice)

      Case Study #1 - Chicago, Illinois - Contract: $24,200 (Materials/Installation)
Scope of Work: Exterior illuminated letters, Exterior custom metal graphic element, Interior ADA signs.
      Case Study #1 - Architectural Drawings - You will need to do a "Takeoff" or in other words, find your signage in the construction drawings.  Here is example we found, an exterior building signage - graphic element (Flat Cut Aluminum) that will need to be priced and be included in your base bid to the General Contractor.
      Case Study #1 - Production Drawings - Once you have a contract to produce the signage, you will need to start on "Submittals" and submit to your General Contractor who will forward to the (AOR) Architect of Record for review/comments.  (These drawings will eventually be approved and sent into scheduled production with your wholesale manufacture of choice)
      Case Study #2 Kay County, Oklahoma - Contract: $9,400 - (Materials/Installation) BEFORE and After picture. Scope of Work: Exterior Flat Cut Aluminum letters, Interior ADA signs.
      Case Study #2 - AFTER picture of the Kay County Oklahoma Department of Transportation.
      Case Study #2 - This is the architectural drawing we used to bid the materials and was used as a reference when supplying the drawings submittal to the architect.
      Case Study #2 - Once you have a contract to produce the signage, you will need to start on "Submittals" and submit to your General Contractor who will forward to the (AOR) Architect of Record for review/comments.  (These drawings will eventually be approved and sent into scheduled production with your wholesale manufacture of choice)

      •  
      •  
      • Home
      • Free Sample: Standard Operating Procedures
      • F.A.Q.
      • What exactly is Division 10?
      • Call to Action
      • What's Inside the D10 Box?
      • D10 Business In A Box PODCAST
      • SOP's
      • Schedule Online Meeting
      • Signage D10 Subcontractor (Case Studies)
      • Testimonials
      • The D10 Husband & Wife Team
      • Call To Adventure!
      • Call: 314 369-8649
      • SOP Video
      Copyright © 2025 All rights reserved - D10 Business In A Box
      •  +1-314 369-8649
      •   nick@d10BusinessInABox.com
      •  
      •